LB Construction Logo
Commercial · 2022

Nungambakkam Flagship

Luxury jewellery flagship with a hand-finished brass facade and museum-grade lighting.

Category
Commercial
Built-up area
11,000 sq ft
Completed
2022
Nungambakkam Flagship

Luxury jewellery flagship with a hand-finished brass facade and museum-grade lighting. Every surface, joinery detail and lighting circuit was specified line-by-line in the BOQ before mobilisation. Site execution followed our 6-checkpoint quality system across 11,000 sq ft of built-up area.

Handed over on schedule with full statutory clearance, a snag-free walk-through, and a 12-month defects liability cover. The project is available for a private site visit by prior appointment.

All projectsBuild something like this