The 4D system

Four doors. Four signatures.

The LB Construction process four gated stages from site survey to handover.

01

Discover

21 Days

Site visit, brief deep-dive, feasibility study, indicative BOQ.

  • Site soil & access survey
  • Statutory feasibility report
  • Indicative budget bands
  • Architect chemistry session
02

Design

4–8 weeks

Architecture, structure, MEP, interior layouts and the locked BOQ.

  • 3 design directions
  • 1:1 VR walkthrough
  • Material library curation
  • Locked, line-item BOQ
03

Deliver

8–12 months

Site execution under our 6-checkpoint quality system and weekly reporting.

  • Dedicated PM + site engineer
  • 6 quality inspections per floor
  • Weekly photo + spend report
  • Snag-walk before handover
04

Dwell

Lifetime

Handover, 12-month defects liability, 5-year structural warranty, lifetime advisory.

  • Detailed handover dossier
  • 12-month snag-resolution
  • 5-year structural warranty
  • Annual maintenance plan (optional)

Traditional builder vs the LB Construction gated process

Pricing

Typical builder

Estimates that drift over time

LB Construction

Locked, line-item BOQ before work starts

Approvals

Typical builder

Verbal or ad-hoc

LB Construction

Signed sign-off at each of four gates

Quality checks

Typical builder

Occasional spot checks

LB Construction

Six documented inspections per floor

Reporting

Typical builder

Only when you ask

LB Construction

Weekly photo and spend report

Design preview

Typical builder

2D drawings

LB Construction

1:1 VR walkthrough before building

After handover

Typical builder

Limited or none

LB Construction

12-month defects liability + 5-year structural warranty

Dependency

Typical builder

Relies on key people

LB Construction

System-driven, not person-dependent

Project delivery models at LB Construction

Turnkey

End-to-end delivery with a single point of accountability.

Best for: Homeowners who want a hands-off experience.

BOQ-Based

Locked, line-item costing before construction begins.

Best for: Owners who want maximum cost clarity and control.

Custom Home

Bespoke, design-led planning and construction.

Best for: Clients building unique villas and custom residences.

Common questions

Process FAQs

Discover, Design, Deliver and Dwell — four gated stages, each ending in a signed document before the project advances.

End to end, most projects run about 10 to 18 months: Discover (around 21 days), Design (4 to 8 weeks), Deliver (8 to 12 months), followed by lifetime Dwell support.

A gate is a checkpoint where the client and LB Construction both sign off on the stage's deliverables before the next stage begins, so nothing proceeds without agreement.

A site soil and access survey, a statutory feasibility report, indicative budget bands and an architect chemistry session, over about 21 days.

During Deliver, LB Construction runs six quality inspections per floor with a dedicated project manager and site engineer, plus a weekly photo and spend report.

A detailed handover dossier, a 12-month snag-resolution period, a 5-year structural warranty and an optional annual maintenance plan.

At the end of the Design stage, before site execution begins, you receive a locked, line-item BOQ.